Project Description
SUBS Construction delivered an in-situ reinforced concrete tank and oil-containment system upgrade at the Port Hacking substation.
The site included heritage considerations, asbestos-impacted soil and operational electrical equipment. Detailed construction planning, environmental controls and high-voltage safety procedures were implemented throughout the works.
Construction of an in-situ reinforced concrete tank and associated pipework as part of an operational substation oil-containment upgrade.















Scope of Works
-
Removal of existing redundant services
-
Excavation for the new containment structure
-
Construction of an in-situ reinforced concrete tank
-
Formwork, reinforcement and concrete placement
-
Installation of permanent access handrails
-
Installation of ventilation pipework
-
Installation of pipe connections and valves
-
Management of asbestos-impacted ground conditions
-
Coordination of works within a live electrical substation
-
Backfilling and site reinstatement